DCIM100MEDIADJI_0011.JPG

Client: Wyokong Investments No.1 & Hudson Homes

Duration: 21 weeks.

Description of project: 50 Lot subdivision (Second release package of three packages), including house lots and installation of services.

Scope:

  • Earthworks on site including tree removal, remediation of uncontrolled fill, bulk excavation to all house lots, roads and footpaths, and detail trimming of all house lots.
  • Road formation works and the construction of over 5000m2 of flexible pavements.
  • Excavation and installation of 1,100m of stormwater pipes and pre-cast pits and lintels for the subdivision stormwater system.
  • Installation of underground services including potable water, sewer, electrical, gas and NBN.
  • Construction of 1200m of kerb and gutter to all roads constructed, including the construction of roll kerb to existing and new roads.
  • Construction of a wetland sediment basin including sandstone retaining wall, Grasscrete maintenance access, GPT access slab and deep water clean out zone.

Value of Contract (Approx): $ 4.0 million