Job title:  Australian Catholic University – Bus Waiting & Set Down Works

Client: Australian Catholic University

Duration:  20 weeks

Description of project: Main entry upgrade including installation of major services

Scope:

  • Delivery of a complex project in a tight time frame during the University’s Summer break
  • Working around heritage listed buildings and narrow areas
  • Working around existing live services and complex redundant infrastructure
  • Earthworks on site including site clearing, removal of existing pavement, General Solid Waste and diesel tanks
  • Road formation work including the removal and treatment of unsuitable subgrade
  • Construction of concrete and asphalt pavement
  • Construction of a raised pavement including piles to minimise the disturbance to existing tree roots
  • Installation of a 2.2m wide common service trench including Hydraulic, Electrical, Gas and Stormwater services
  • Hard and soft landscaping including relocation of six large palm trees and the installation of an irrigation system
  • Brick paving work including a trafficable bluestone paving area
  • Fabrication and installation of a curved Bus Shelter, Pump room and Garbage room enclosures
  • Installation of light poles and in ground lighting

Value of Contract: $ 4.0 million