Road Works Western Sydney Airport – Technical Equipment Rooms Cherrie Civil Engineering have been by Multiplex complete civil works at the technical equipment rooms for the Western Sydney Airport, enabling the building and construction trades with all weather access, temporary works and site facilities. Western Sydney Airport – Fuel Farm As an extension to Cherrie Civil Engineering existing works at Western Sydney Airport for Multiplex Construction, Cherrie Civil has been engaged to complete the bulk earthworks and civil stormwater for the ‘Fuel Farm’ – fuel storage and ancillary service buildings. Blue Mountains National Park Precinct Upgrades Detail excavation, construction of new infrastructure including retaining walls, landscaping and facilities structures to service the Conservation Hut and Evans Lookout precincts. Proximity Banksmeadow Cherrie Civil Engineering have been engaged by Taylor Construction Group at the Proximity Banksmeadow Project for the construction of two warehouse structures. Western Sydney Airport – Terminal Civil Works Cherrie Civil Engineering have been engaged by Multiplex to complete all civil works associated with the construction of the Western Sydney International Airport. Cherrie Civil is working in unison with Multiplex and other trades to deliver both the permanent and temporary civil works to enable future trades to mobilise Western Sydney Airport – Bulk Earthworks Bulk filling and excavation to facilitate construction of foundation piles and retaining structures, this includes the modification of batters, bulk haulage of materials and placement and compaction of fill to geotechnical specifications. Nepean Hospital – External Works Cherrie Civil Engineering have been engaged for the third time with CPB contractors at the Nepean Hospital to complete the final stage of civil works at Nepean Public Hospital. Campbelltown Hospital – Therry Road Intersection Therry Road intersection is the third addition of works for Cherrie Civil under the larger Campbelltown Hospital Development Project. Randwick Campus Redevelopment – Hospital Road Lowering Lowering of Hospital Road to facilitate access to the new Randwick IASB development. The project included a complex sequencing of diverting, replacing and amplifying existing live hospital and public service infrastructure whilst maintaining critical services to a functioning hospital. Wests Tigers Training Ground Civil works for the construction of a temporary training facility for the Wests Tigers NRL team. Wahroonga Roadworks Intersection widening inclusive of services relocation and installation, construction of footpaths and retaining walls, pavement widening and new pavement construction. Sydney Airport Hotel Site remediation, bulk earthworks, detailed excavation, asphalting works Vaucluse Roadworks Completion of street scape works on the corner of Laguna St intersection Western Sydney Airport – Visitors Centre Airport Completion of external civil works for the newly constructed airport visitors centre Campbelltown Hospital Redevelopment Site remediation, demolition, bulk earthworks, shoring, stormwater construction, structural piling, detailed excavation, FRP core bases, and road pavement construction. Macquarie Park Redevelopment – Stage 1 Service installation (sewer, potable water, gas, communications), bulk earthworks and pavement construction. Campbelltown Hospital Carpark Site remediation and enabling works, stormwater installation, and construction of 3x carparks. Glenhaven Church Carpark Construction of a new on-grade carpark for the Emmanuel Anglican Church at Glenhaven Northern Beaches Hospital – Roadworks Pavement works, Detail Excavation, Services, Concrete/Structural works for the Northern Beaches Hospital Precinct. Westmead Hospital Bulk Works Bulk & Detail Excavation, Shoring, Foundations, Services and remediation for the Westmead Hospital Acute Services Building. Westmead Hospital Early Works Excavation of Service Trenching to facilitate the installation of new boom gates. Supervise the placement of asphalt at the entrance to A W Edwards new carpark. Australian Catholic University – Bus Waiting & Set Down Works Main entry upgrade including installation of major services. Strathfield Golf Course Subdivision Subdivision of 50 lots including all associated services. Sparks Road, Wyong – Stages 5 & 6 28 Lot Subdivision (Third release package of three packages), including house lots and installation of services. Hezlett Road, Kellyville – Subdivision Development of existing residential site for new subdivision. Sparks Road, Wyong – Stages 3 & 4 50 Lot subdivision (Second release package of three packages), including house lots and installation of services. Sparks Road, Wyong – Stages 1 & 2 Remediation and preparation of existing site for subdivision. Field of Mars Road Resurfacing Resurface 8,500m2 of internal cemetery roads. Northern Beaches Hospital Bulk Excavation works for Northern Beaches Hospital main hospital and carpark.